Your home's footprint
The size and shape of the house set how much concrete, steel and form work the slab takes. A garage or porch tied into the slab adds edges to form and pour, so bring your plans and we'll measure the lot against them.
Building on a clay lot and worried the slab will shift? We pack the base, guard the moisture barrier and pour it right.

Slab foundation building in Laredo, TX means pouring a concrete floor slab that sits right on the ground and serves as your home's foundation, and at K&L Laredo Concrete Construction we build them for homes and small buildings in Laredo and the cities around it.
On our clay, that slab has to stand up to the ground pushing and pulling under it as the soil gets wet and dries out. So most of the job is what you never see. The subgrade, the dirt the slab sits on, gets dug out and packed, the steel goes in, the moisture barrier goes down whole, and then we pour.
The price moves with the size of the footprint, how much dirt work the lot needs and whether you go with a regular rebar slab or a post-tensioned one. The schedule turns on the city's permit review, which we handle for you, the weather on pour day and the cure before framing. Your written estimate puts each part on its own line, so you see what you're paying for.
A few things get settled before the truck shows up, and each one changes the price, the schedule or how the slab holds up once the house is sitting on it.
The size and shape of the house set how much concrete, steel and form work the slab takes. A garage or porch tied into the slab adds edges to form and pour, so bring your plans and we'll measure the lot against them.
Plumbing lines and any conduit that run under the floor have to be set and stubbed up before the pour. Once the concrete is down, moving a drain means cutting into the slab, so we check those spots with you and your other trades ahead of pour day.
Curing is the wait while the concrete gains strength, and it needs to stay damp enough to do that slowly. Framing and heavy loads go on after that, because a slab loaded too soon can chip or crack at the edges. We'll tell you when it's ready.
Here's how a slab foundation job runs with us, from your first call to the walk-through, including where the city's permit review fits into your schedule.
You call (956) 508-9209 or fill out the form. I come out to the lot myself to look at the ground, take measurements and ask what the building will be used for.
You get a written estimate with each part of the work on its own line. If the job needs a permit, we take care of it with the city, which allows up to 21 days to review a home permit, and a complete submittal avoids delays.
Our crew digs out and packs the base, lays the moisture barrier, sets the steel and forms, then pours and finishes the slab. After that it cures before anything goes on top of it.
Once the slab has cured and the forms are pulled, I walk the finished job with you before we pack up. That's your chance to ask anything about it before the framers take over.
The base is where I put the most care, because a good-looking slab on a bad base won't hold up. We dig out the soft dirt and pack the subgrade instead of raking it level, so the slab doesn't settle with loose fill. We also check where water runs on the lot, so the ground isn't sending rain back toward the foundation.
We guard the moisture barrier, the plastic sheet under the slab, and patch every hole before the pour. One barrier maker's research says even small holes can sharply raise the water vapor coming up through a slab, and that can ruin floor coverings or hold up laying your floors. A tear from a boot or a stake is easy to miss, so we walk the sheet before concrete goes down.
We pour early, before the midday heat, because concrete that dries too fast can end up with a weak, dusty top. When a budget gets tight, the base is usually the first thing people want to cut, since nobody sees it once the slab is down. I'll trim the finish before I trim the base, and I'll say so on the estimate.
If the building needs more than a slab on the ground, our foundation installation work covers the rest of what goes underneath. Small business owners often need room to park too, and we handle concrete parking lot building alongside the slab, so the two are graded to work together.
Rebar is steel bar tied in a grid inside the concrete, and it holds the slab together so the small cracks that do show up stay tight. It's the familiar choice for a lot of homes.
Steel cables run through the slab and get tightened after the pour, squeezing the concrete so it resists the ground moving under it. On a clay lot it's worth asking for a price on this one.
We reply to every call and message within one business day. I'll set a time to come out, look at the lot and measure, then you get a free written estimate, line by line, with no obligation.
(956) 508-9209The City of Laredo issues the building permit for a new home, and its review checks that the work is safe and meets zoning and building codes. The city also posts guidance for home foundations, including anchor bolts and how a foundation-only permit can be approved in phases, so it's worth a look while your plans come together.
The ground is the bigger story here. The most common soil in Webb County is a clay that's sticky when wet and rock-hard when dry, and that kind of clay shrinks and swells a lot as moisture comes and goes. Around Laredo and the cities nearby, we see that movement in cracked older slabs, and it's why the base and slab type matter so much on a new one.
I learned concrete from my dad, setting forms and pulling screed boards on his jobs as a teenager, and I started this business in Laredo in 2021. That's five years on our own. I come out to look at every job myself, and our crew does the work with me on site, so the person who wrote your estimate is there for the pour.
We're fully licensed and insured. I'd rather tell you no than pour something I don't believe in, and I want you to know exactly what you're paying for before we start. Your satisfaction, guaranteed. Call (956) 508-9209 or send us the form to set up a visit to your lot.
When a building needs more than a plain slab on the ground, this is the foundation work that sets it up to carry the walls and roof.
Shops and small businesses that need space for customers to park can have the lot poured and graded alongside the new building's slab.
We're based in Laredo, TX and build slab foundations in Laredo and the cities around it. If your lot is nearby, call and we'll set a time to come look at it.
A reinforced concrete slab in Laredo usually costs about $6 to $10 per square foot. Where yours lands depends on the size of the home, how much dirt work the base needs and which slab type you choose. Your written estimate breaks your own job out line by line.
A new home goes through the city's building permit process, and in Laredo the hired contractor typically pulls the permit. If you pull it yourself, the city treats you as the contractor for the project. We pull it with the city as your hired contractor, so that role stays with us.
It's worth getting a price on one. The Post-Tensioning Institute, a trade group, says post-tensioned slabs perform better than regular reinforced slabs on soils that shrink and swell, and calls them cost-efficient. Since that's the clay most lots around here sit on, ask us to put it on your estimate next to a rebar slab.
Yes, some movement is normal. Industry guidelines on foundation movement say all foundations move to some degree, and even one designed and built right is expected to move a little unevenly. I'll tell you plainly what's normal at the walk-through, so a small shift later doesn't catch you off guard.
Make sure a concrete truck can get close to where the slab goes, and move vehicles or stored materials out of the way. Have your house plans handy and know where your plumber wants lines to come up, because those get set before the pour. We'll go over the rest on site.
The longest wait is usually before we start, while the city reviews the permit, which we covered in the steps above. After that, base prep and the pour move with the weather, since we pour early to stay out of the midday heat, and the slab needs its cure before framing.