Most calls start with something you've already noticed. There's a slick patch by the pool steps, puddles that hang around after everyone gets out, a crack running out from the coping, or a section that's dropped. Those usually trace back to the ground under the slab or a deck that was never graded to drain, so that's where we look first, before we ever talk finishes.
What moves the price is the size and shape of the deck around your pool, whether an old deck has to come out first, how much digging and packing the ground needs, and the finish you choose. Your written estimate puts each of those on its own line, so you can see where the money goes before we start.
The schedule turns mostly on the weather around pour day and on curing, the wait while fresh concrete gains strength before it can take feet and furniture. If your job needs a permit, we pull it with the city as your hired contractor, and we build that into the timeline we go over with you.